Danishconstructions Solarwindow
HomeAboutNewsProductsProcessEngineeringDownloadsContact

Foundations

Set Out

Xypex

Wall Construction

Steel Reinforcement

Concrete Placement

Top Plate

Arches and Curves

Plumbing and Electricals

Plastering

External Finishes

Load Bearing

Retaining Wall


Plumbing and electrical cables are easily chased into the polystyrene face. This can be done with a router, Stanley knife, chisel or specialized electric hot wires.
1. Using the hot knife is a neat way to channel the polystyrene in readiness for the cables.
2. Plumbing is channeled into the polystyrene prior to the fixing of plaster or tiles.

© Copyright 2004 insulbrick